Phase 1:
Though donations and offerings taken at the Metro Detroit Area (formerly
Southeast Area) Annual Gathering, a portion of the work was completed
during the Summer of 2006.
- The existing single-pane windows were replaced with thermal windows.
- Existing wood doors replaced with steel.
- Removal of landscaping.
- Painting of the exterior